# Fitted Wardrobe Installation Process in East Lothian

## What to Expect from the Process

Fitted wardrobe installation follows a clear sequence: survey, design sign-off, manufacture, and fitting. Understanding each stage helps you plan around it and avoid surprises on the day. Most East Lothian homeowners find the entire process takes two to four weeks from initial survey to a finished wardrobe, depending on the complexity of the design and the joiner's lead time.

The work itself is carried out in your bedroom, so expect dust, noise, and limited access to that room for the duration of the fit. A single-room installation with standard sliding or hinged doors typically takes one to two full working days on site.

## The Survey and Design Stage

A professional installer will measure the room in millimetres, not centimetres. Walls in older East Lothian properties, particularly stone-built cottages in villages like Dirleton or Athelstaneford, are rarely perfectly square or plumb. The surveyor checks for skirting boards, cornices, ceiling drops, and any radiators or sockets that fall within the wardrobe footprint.

From those measurements, a CAD drawing or detailed sketch is produced showing shelf positions, hanging rail heights, drawer configurations, and door panel layouts. You review and approve this before anything is ordered. Changes made after manufacture begin are costly, so take time at this stage.

### Choosing Materials and Finishes

The carcass (the structural box of the wardrobe) is usually made from moisture-resistant MDF or melamine-faced chipboard. Door faces can be wrapped in vinyl, painted MDF, or solid timber veneer. Each material has a different lead time: painted MDF doors are often sprayed to order and may add five to ten days to the schedule.

Hardware choices, including soft-close hinges, undermount drawer runners, and LED interior lighting, are confirmed at this stage. These small decisions affect both the final price and the installation sequence.

## What Professional Installation Involves

On fitting day, the installer strips the room of any furniture already agreed upon and lays protective sheeting on the floor. The first task is fixing a level base frame or plinth directly to the floor, then building the carcass panels up from that point. Each panel is checked for plumb and level before the next is fixed.

Scribing is one of the most skilled parts of the job. A scribe is a thin strip of material cut to follow the exact contour of an uneven wall or ceiling, so the finished wardrobe appears flush against the surface with no visible gap. Poor scribing is the most common sign of a rushed installation. After the carcass is complete, internal fittings such as shelves, rails, and drawers are fitted, followed by the doors and their tracks or hinges.

### Electrical and Plastering Considerations

If your design includes interior lighting, a qualified electrician needs to run a spur to the wardrobe location before the carcass goes in. Coordinate this in advance. Some installers work alongside a trusted electrician; others expect you to arrange it separately.

Any sockets or light switches that fall inside the wardrobe area must be relocated before installation starts. In East Lothian, local joiners often recommend getting a Part P-registered electrician to handle this, as the work needs to comply with building regulations.

## Factors That Affect How Long Installation Takes

Room size is the most obvious factor, but it is not the only one. Corner wardrobes and L-shaped configurations take longer to fit because the two runs must meet precisely at an internal corner. Ceiling-height doors on a room with an uneven ceiling add scribing time.

The number of internal components also matters. A wardrobe with six drawers, pull-out trouser racks, and a mirrored interior panel takes significantly longer to fit than a simple hanging rail and shelf arrangement. Period properties with sloping ceilings or chimney breast recesses, common in some East Lothian coastal towns, require extra templating time before any cutting begins.

## Preparing the Room Before the Fitter Arrives

Clear the entire wardrobe wall and at least one metre of clearance in front of it. Beds, bedside tables, and free-standing furniture should be moved to the centre of the room or into another space. If the wardrobe runs the full width of the room, the whole room must be cleared.

Take down any pictures or mirrors on the wardrobe wall. Remove curtain poles and blinds if they sit within the wardrobe footprint. The fitter will need unobstructed access to plug sockets and may need to temporarily disconnect wall-mounted TVs on adjacent walls if drilling vibration is likely.

## How to Prepare Your Walls

Walls should be dry, structurally sound, and free from loose plaster before installation begins. If you have recently had a leak or rising damp, have it investigated and repaired first. Wardrobes fixed to soft or crumbling plaster are a safety risk and may void any installation guarantee.

Fill and sand any large holes from previous picture hooks or shelving brackets. The fitter will fix into the wall studs or use appropriate cavity fixings for stud partition walls, but very uneven surfaces can complicate scribing. If you plan to repaint the room, do it before the wardrobe goes in rather than after. Painting around a fitted wardrobe neatly is significantly harder, and masking tape pulled from a freshly painted wardrobe door can lift the finish.

## Frequently Asked Questions

### How Long Does Fitted Wardrobe Installation Take in East Lothian?

**The on-site fitting typically takes one to two full working days for a standard bedroom wardrobe.** The total process from initial survey to completion usually runs two to four weeks, depending on the complexity of the design and the lead time for materials. Corner units or ceiling-height doors on uneven walls can add half a day or more to the fitting itself.

### What Is Involved in Professional Fitted Wardrobe Installation in East Lothian?

**Professional installation covers a measured survey, a design drawing for your approval, manufacture of the carcass and door panels, and then the on-site fit.** On fitting day, the installer builds a level base frame, constructs the carcass panel by panel, scribes any gaps to uneven walls or ceilings, and then fits internal components and doors. If lighting is included, an electrician needs to be coordinated separately before the carcass goes in.

### What Factors Affect How Long Fitted Wardrobe Installation Takes in East Lothian?

**The main factors are the total length and height of the wardrobe run, the number of internal fittings such as drawers and pull-out rails, and the condition of the walls and ceiling.** Period properties in East Lothian, particularly stone-built homes with uneven walls or sloping ceilings, require extra templating and scribing time. Corner configurations and L-shaped runs also take longer than a straight single-wall installation.

### What Furniture Needs to Move Before Fitted Wardrobe Installation in East Lothian?

**Everything along the wardrobe wall and at least one metre in front of it must be cleared before the fitter arrives.** This includes beds, bedside tables, chests of drawers, and any free-standing furniture in the path of the work. Pictures, curtain poles, and blinds on or near the wardrobe wall should also be removed in advance. If the wardrobe runs wall to wall, the entire room will need to be cleared.

### How Do I Prepare Walls for Fitted Wardrobe Installation in East Lothian?

**Walls need to be dry, structurally sound, and free from loose or crumbling plaster before the fitter starts work.** Any dampness should be investigated and resolved beforehand, since a wardrobe fixed to compromised plaster is unsafe. Fill large holes from old fixings and, if you plan to redecorate, paint the walls before installation rather than after. Painting neatly around a fitted wardrobe is significantly harder than painting a clear wall.